The Edit Basis Of or Activities command, accessed from the Diagram ribbon, allows you to specify the basis of target entity for the currently selected requirement. The command opens a target window on the basis of relation from which you can add or remove entities as desired.
NOTE: |
Allocating a single entity can often be accomplished most quickly by dragging and dropping from the diagram Toolbox - either by dragging the Activities construct from the Insert Constructs tab, or by dragging the specific entity to be added from the Key Entities listing. |